MQ-25 FY21
Abstract
$48M CCS FY21 funding realigned to PMA-268(MQ-25) during execution due to: 1) $35.1M cost avoidance realized by fielding Minotaur with CCS and deferring the program's Inc. III study. 2) $9.1M platform integration savings due to the Navy's decision to switch the MQ-25 Ground Control Station (GCS) from the MD-5 A/B to the MD-5 C/D/E GCS. 3) $3.7M Systems Integration Support (Gov't/Contractor).
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2023
- Source ID
- f403e3205f7370320d5ca2a8a989333f