Formulation and Risk Reduction
Abstract
Subsequent to review and recommendation of project concepts by the new Technical and Transition Cross Functional Teams, the Strategic Capabilities Office performs engineering trade studies and conducts component tests to prepare selected projects to be ready to enter into full prototype development under the Advanced Innovative Technologies Program Element. Activities, such as proving component and subsystem maturity prior to integration in major systems, are intended to finalize key requirements to reduce technical risk during prototype development. Due to the nature of these projects, specific applications and detailed plans are available at a higher classification level.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2023
- Source ID
- f93bcb7927e446743b29a977b26ab643