XLUUV Product Development

Abstract

Orca XLUUV Phase 1 design was completed via a full and open competition with two industry teams. Phase 2 fabrication was down selected to one vendor for the fabrication and delivery of 5 Orca vehicles. In March 2022, the Navy added a test/training asset (XLE0) and test/ fix/test level of effort (LOE) period to reduce risk of achieving performance requirements and future delivery schedule of the JEON vehicles.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2025
Source ID
fc09876cdd5617b62afcf3ab73891a00

Tags

Readers

  • Educational Psychology
  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.
  • Life Cycle Cost Analysis

Related Documents