XLUUV Product Development
Abstract
Orca XLUUV Phase 1 design was completed via a full and open competition with two industry teams. Phase 2 fabrication was down selected to one vendor for the fabrication and delivery of 5 Orca vehicles. In March 2022, the Navy added a test/training asset (XLE0) and test/ fix/test level of effort (LOE) period to reduce risk of achieving performance requirements and future delivery schedule of the JEON vehicles.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2025
- Source ID
- fc09876cdd5617b62afcf3ab73891a00