Navy Strategic Comms
Abstract
The details of program element 0101402N Project 1083 are classified UNCLASSIFIED//FOUO and are submitted to Congress in the classified budget justification books. Special Handling Statement: This exhibit contains NC3-N Controlled Unclassified Information (CUI). UNCLASSIFIED//FOUO material within shall be developed, stored, and transmitted on classified networks in accordance with SPAWAR ltr 5510 Ser 00/245 19 April 2018. Project 2959: The E-XX Take Charge and Move Out (TACAMO) Recapitalization program provides the complete replacement aircraft and mission systems for the aging E-6B aircraft. The program is intended to provide Survivable Airborne Strategic Communications in support of the President, Secretary of Defense and United States strategic and non-strategic forces. In order to provide survivable, endurable and reliable Command, Control, and Communications capability, continued effort is needed to perform technical evaluations, modeling and simulation, requirements derivation and contract development. Funding is for reducing integration risk on aircraft, developing requirements and risk reduction contracts, and a development program. Project 3002:The E-6 is a manned airborne platform that provides survivable, endurable and reliable Command, Control and Communications capability in support of the President, Secretary of Defense and United States strategic and non-strategic forces. In order to respond effectively to emerging capability requirements, continued effort is needed to perform technical evaluations, modeling and simulation, investigative ground and flight testing, enhanced software modifications and development of configuration modifications. Funding is for operational mission analysis and hardware/software engineering required to optimize E-6 systems for cyber security and interoperability in a strategic environment.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2022
- Source ID
- 0101402N_7_1319_PB_2022
- Change Summary Explanation
- The details of program element 0101402N Project 1083 are classified and are submitted to Congress in the classified budget justification books. Funds in Project Unit 2959 decrease from FY21 to FY22 due to transfer of effort to new PE 0605180N Project Unit 3259 beginning in FY22. Technical: 2959: Not Applicable 3002: Not Applicable Schedule: 2959: Requirements Derivation moved from 4Q FY21 through 3Q FY23 to 4Q FY20 through 3Q FY21; Engineering and Manufacturing Development (EMD) Statement Of Work/RFP development moved from 4Q FY23 through 3Q FY24 to 4Q FY21 through 2Q FY22; RFP moved from 3Q FY24 to 2Q FY22; Contractor Bid period moved from 3Q FY24 through 1Q FY25 to 2Q FY22 to 3QFY22; Contract Award moved from 3Q FY25 to 1Q FY23; Milestone B moved from 3Q FY25 to 4Q FY22; PDR moved from 2Q FYO24 to 3Q FY23; SFR moved from 4Q FY23 to 2Q FY23; VLF Risk Reduction end date moved from 3Q FY24 to 4Q FY22. 3002: Studies and Analysis end date moved from 4Q FY21 to 4Q FY22
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Shore To Ship Com System
- Child Accomplishment: Shore To Ship Com System
- Child Cost Item: 6e5fcf136038ee52148144310f8cbcd0
- Child Cost Item: d7949d7a77bc1dee71e5d25821c85f61
- Child Cost Item: 6775d195db62ca4c6ee63c863d51c778
- Child Cost Item: f2b34a78ec98fa46a4b060be208f7f96
- Child Project: Survivable Airborne Strategic Communications
- Child Accomplishment: Operational System Development, Studies and Demonstrations
- Child Cost Item: 1130f7ab7fc8ff85f75cba985bf55f22
- Child Cost Item: 4c31451562ac0b885d54b623a9ce6325
- Child Cost Item: cc35851e0fb603fa607bd0cae5ff4396
- Child Cost Item: 91fc5b521faf17785970a59ceea39014
- Child Cost Item: 4fad25d5825dca4ceac71d7fede2c562
- Child Cost Item: f8e5479998d9ccccefb80c1070c79624
- Child Cost Item: 8784f1ff1c5d44c4a4fbaec596c7fbf6
- Child Cost Item: e185e5162308d26dce55bf2199be5b7f
- Child Cost Item: 0cc852d80770b2fff53546c7d892ec61
- Child Project: Navy Strategic Comm Project
- Child Accomplishment: Operational System Development, Studies and Demonstrations
- Child Cost Item: fff11947db90133a8fc8e5ee8b45a91b
- Child Cost Item: cf14b4a2e69e3f64c595f9b2efca1123
- Child Cost Item: f31b154089a2eeb5a60d2994dede554a
- Child Cost Item: 13339d6620f9fe5a0575a25b2902e7d2
- Child Cost Item: 829738bd9ef04d5a6215dce4091aa1f5
- Child Cost Item: 3eb0b65740a4016511d419fe0be9531d
- Child Cost Item: fa5289bbb14bb80427c56eb63d7d6c2e
- Child Cost Item: 4443e8379ee90322bcf6cc102746e254
- Child Cost Item: a7ab0837222703c474fb43e36f2f7ed2
- Child Cost Item: 1699d11eff72978defa2648da60eed0b