Marine Corps Cmbt Services Supt
Abstract
This program element (PE) provides funding for Marine Air-Ground Task Force requirements for Combat Service Support equipment improvement. It will enhance combat breaching capabilities of the ground combat elements, logistics, maintenance and transportation. The PE also provides improvements in all areas of Combat Service Support Equipment Vehicles by determining the replacement for the heavy, medium and light fleet vehicles. Alternative Power Sources for Communications Equipment (APSCE) is a suite of devices that provide the commander with the capability to use existing power to operate his communication equipment, computers and peripheral equipment instead of using batteries or fossil fuel generators. The Marine Corps Family of Automatic Test Systems (ATS), formerly TETS, provides automatic testing capability for use by technicians both in garrison and forward edge of Battlefield. This project includes improvements in all areas of the M1A1 main battle tank. The M1A1 tank provides armor protected firepower to the USMC ground combat element. Its advanced thermal sights provide superior target acquisition and target identification. High Performance Capabilities for Military Vehicles Project: This project is dedicated to applying the best practices of the motor sports industry to military vehicles including engineering expertise, equipment and technology. Marine Personnel Carrier Support System: Product Data Management and Technical Information Architecture Application development and integration to include requirements analysis, detailed system design, analysis of alternatives, implementation, and integration of a risk management tool.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2012
- Source ID
- 0206624M_7_1319_PB_2012
- Change Summary Explanation
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Logistical Veh Sys Replacement (LVSR)
- Child Accomplishment: LVSR: Engineering/Program Management
- Child Accomplishment: LVSR: Engineering Support
- Child Accomplishment: LVSR: Operational Test and Evaluation
- Child Cost Item: a708f0f64d9d25d2da6e47845ce39401
- Child Cost Item: c3bbc25b7bdaa4a9b6e3031975f27f26
- Child Cost Item: c6a0f19aab9ebf0d2508ddf51aecf991
- Child Cost Item: e942b579d4d7e3e7ddd2fc6dad84ba3f
- Child Cost Item: 8e45763d117eb0fc2366f07031a9a91c
- Child Cost Item: 1e847b6a3a5a0ddbf3a5b2005fe93128
- Child Cost Item: 49b33cfafc4ef130d3f519f874b8397d
- Child Cost Item: 70a755f162fc9f0233bd0c5490ce11df
- Child Cost Item: 136b2486c8866f4d821648f997a1871b
- Child Cost Item: b827ec756b0b307ce0db9594e256bfcc
- Child Cost Item: cf35141bad67c0eca6d16e763dd6ffdb
- Child Cost Item: d9dc90f0694fdce0c07f3710406f4c01
- Child Cost Item: bea3f6d89bc0dd7d158bda692363823e
- Child Cost Item: 68264e46cd2bb0f77039c87ae58b800f
- Child Cost Item: 0051e293992a32cb2a4017552785110e
- Child Cost Item: 26fa71f90b1fb0f0589a47d975032cd4
- Child Cost Item: b2cd9a8d32f7e5965e98cae8bfd18ee3
- Child Cost Item: 3c33bb4214fac2fbbd5262343b7ab1a5
- Child Cost Item: 165168cf906c6e071ef1999f06c3e51d
- Child Cost Item: a9c111b4389a9c40e3d503921d520f3f
- Child Cost Item: cf009196faf661b1339e4c2e3b186b1b
- Child Cost Item: 57ad135d4b673588fd973ed933401241
- Child Project: Combat Service Support Eng Equip
- Child Accomplishment: Engineering Mod Kits
- Child Accomplishment: M1A1 Survivability/Lethality Program
- Child Accomplishment: M1A1 Modifications
- Child Accomplishment: Route Reconnaissance and Clearance (R2C):
- Child Accomplishment: R2C: Program management and engineering support
- Child Accomplishment: R2C: Conduct Developmental Testing
- Child Accomplishment: Assault Breacher Vehicle (ABV)
- Child Accomplishment: Corrosion Prevention and Control (CPAC)
- Child Accomplishment: MRAP FoV Engineering Upgrade Solutions
- Child Accomplishment: MRAP MATV Ballistic Test and Evaluation
- Child Accomplishment: MRAP 1 Ballistic Test and Evaluation
- Child Cost Item: ee1cbc786b5ffda3af0592a4e7e82282
- Child Cost Item: bddb629141a0370319517918f6129201
- Child Cost Item: f10c556715edf7f85057c62ac85ee31c
- Child Cost Item: 12fdd5207a09cd7a3efd3ce7a31aa1a0
- Child Cost Item: 4c139f13d53f96af7668a4388d94fac0
- Child Cost Item: e6e667cbee552560c81ee4a27838d83c
- Child Cost Item: d2391cb7a5edd2554c9f1de87da96c68
- Child Cost Item: eff15fa75f5352c4a91e58394aa5c90a
- Child Cost Item: 35ed3934de2225ca47e294b2a32293df
- Child Cost Item: c1c5221151eb05d05fb4e35d2ec0cb99
- Child Cost Item: a30e750fba0a65fc58b8da9c21a3f464
- Child Cost Item: ce0420c6210632f24ad03c271968390e
- Child Cost Item: efb2e355d234aa923346f0e10635daed
- Child Cost Item: 8c3b7010ac8ae01594930ffdbee71ef6
- Child Project: Motor Transport Mod
- Child Accomplishment: Improved Recovery Vehicle (IRV)
- Child Accomplishment: High Mobility Multi-Wheeled Vehicle ECV (HMMWV-ECV)
- Child Accomplishment: FRC: Flatrack
- Child Accomplishment: P-19 Replacement
- Child Accomplishment: Motor Transport Modification (MTM): Test
- Child Cost Item: 8b058ff00bf9b06ce3af1dd76b947fc7
- Child Cost Item: 910885fa8fb5e7f381c1b3cbd0cec6d1
- Child Cost Item: e272633dcfa4f61dab4f93578fee33ec
- Child Cost Item: ccffef17c31d67d8de57ff3c1d3a0599
- Child Cost Item: 4ea39f9797cf9bd7a76d6aea2c904db1
- Child Cost Item: 27571888cc086456968a1236232af5e2
- Child Cost Item: e8c9cd44288d85f8eb184172833ab54d
- Child Cost Item: 84898a4904154fa6308ca591bcebed8f
- Child Cost Item: e74c74a385a5a4071877e31b25cc1676
- Child Project: Testing Measuring Diag Equip & SE
- Child Accomplishment: Marine Corps Automated Test Equipment
- Child Accomplishment: Autonomic Logistics
- Child Cost Item: 055419acec8b90c0ac01ea11f6199754
- Child Cost Item: e5ae8b1a271f2056eb061f0efeaacab1
- Child Cost Item: 428128c38479b9b4ba55fada13dd814e
- Child Cost Item: 4d0dc384b5cc2a42687254552fad831e
- Child Cost Item: 75c6cf944675265234ec3321c02fa5cf
- Child Project: Congressional Adds
- Child Project: MTVR Mod
- Child Accomplishment: Medium Tactical Vehicle Replacement (MTVR): Energy Efficiency
- Child Accomplishment: Medium Tactical Vehicle Replacement (MTVR): ECP
- Child Accomplishment: Medium Tactical Vehicle Replacement (MTVR): Safety
- Child Accomplishment: Medium Tactical Vehicle Replacement (MTVR): Upgrade
- Child Accomplishment: Medium Tactical Vehicle Replacement (MTVR): Obsolesence
- Child Accomplishment: Medium Tactical Vehicle Replacement (MTVR): Quality
- Child Cost Item: 08f74e3573f71ca417b08c153b32aa75
- Child Cost Item: 46a4f191051c605f47c65f2ca08328e2
- Child Cost Item: 9a3569e49a1c89309696999cd8364b3a
- Child Cost Item: 8b6241943de6faf0a8a5a264139f08d5
- Child Cost Item: 7df4bfae3dc4c4d7d5bef779b688afe5
- Child Cost Item: 1296f0cef386839a7ce42816bb781c11