Advanced Surface Machinery Sys
Abstract
This Program Element (PE) supports innovative research and development of advanced surface ship Hull, Mechanical, and Electrical (HM&E) components and systems, primarily power and energy systems, and the subsequent test, evaluation, and demonstration of those systems for future ships and back-fit ships, where appropriate. This PE provides resources for HM&E cyber security. This PE also serves as the bridge for power and energy systems between Science and Technology (S&T), ship platform, and mission systems acquisition programs by identifying prospective applications for S&T research, advanced development, and performing additional product development and qualification when necessary to meet platform or mission system requirements. This PE includes risk mitigation efforts for the DDG(X) Integrated Power System (IPS) which will satisfy the FY20 National Defense Authorization Act (NDAA) Section 131 requirements for land-based testing of propulsion systems in a realistic environment and FY22 NDAA Section 221 requirement for a land-based test program for the engineering plant prior to DDG(X) construction start. The hull agnostic Integrated Power and Energy System Test Facility (ITF) is being transitioned into the DDG(X) Integrated Power System (IPS) Land Based Test Site (LBTS). This approach capitalizes on past Navy investments in modeling and simulation, hardware procurement, integration, and lessons learned. The IPS hardware development and procurement and Land Based Test Site (LBTS) integration and test efforts executed under this PE / PU are informed by DDG (X) Ship Design specifications developed under PE 0603564N / PU 0411.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2023
- Source ID
- 0603573N_4_1319_PB_2023
- Change Summary Explanation
- FY 2021 decrease of $1.366 million is due to SBIR/STTR Reductions. FY 2022 Congressional mark of (-$12.7M) to the DDG(X) Power and Propulsion Risk Mitigation and Demonstration sub-project impacts hardware procurement shifting award of main gas turbine from FY 2022 to FY 2023. FY 2022 to FY 2023 increase is due primarily to DDG(X) Integrated Power System (IPS) Land Based Test Site (LBTS) modifications, hardware procurements and test site infrastructure refurbishments. --- FY 2023 funding increase reflects the fact that the FY 2022 President’s Budget request did not include out-year funding.
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: Integrated Power Systems (IPS)
- Child Accomplishment: DDG (X) Power & Propulsion Risk Mitigation & Demonstration
- Child Accomplishment: Power and Energy Systems
- Child Accomplishment: HM&E Cybersecurity - Hardware Development / Prototyping & Cyber Analysis
- Child Accomplishment: Naval Power Technology Development / Platform Integration & Transition
- Child Cost Item: ce6bab2a190140ca71eea201081b5356
- Child Cost Item: 0632a9a2f99da1b052c506474c7b534d
- Child Cost Item: 15a0b778dc1639a26d05a6a45617638f
- Child Cost Item: 9b3532b9980f02a4ec52dfc7583a42ce
- Child Cost Item: c89496f96ba0ee8bd0689143d5366497
- Child Cost Item: 4cb8903cab1d2011aedf162bb9114d6f
- Child Cost Item: 7d97ac9993d38f07a605d03f5aee04b6
- Child Cost Item: 5f2d0e46568287a7a6392152cd5856d2
- Child Cost Item: 1f64498b8987bc47cebd087f945e7c07
- Child Cost Item: 4e621d39fcb677b4da24b66b4c6fe030
- Child Cost Item: 05dfdf28d45f242107b94610cc35feed
- Child Cost Item: 7a8e9c8db091680589ef3f08167b6afa
- Child Cost Item: 0ede7b87e0383275be1ffe4fdda77919
- Child Cost Item: 6d35a974270e42887558eff2d4c74b53
- Child Cost Item: 3a3aaca104d4f4077957051f64a8328e
- Child Cost Item: 79abe405783b449204ec993319e2384c
- Child Cost Item: c4d2c19177f576849b706a71fd579ccc
- Child Cost Item: 94d9544afbb9cd36e90315a0d56335fb
- Child Cost Item: 2e36dab91e5f4cb9eb8d68cf487072ca
- Child Cost Item: 5652a1a78b9a1cb0f78ba793d23ab687
- Child Cost Item: b26c5bf321d0739aa02545dcf272d439
- Child Project: Congressional Adds
- Child Cost Item: 75684d5fc4632ca2d4548d06733ff042
- Child Cost Item: 4116354d4ef63b1ad8e7c933d6ccdf7e
- Child Cost Item: b5773f7463293ce082535fa51441380b
- Child Cost Item: 11cadd67eb052509683c6eda13bb525d
- Child Cost Item: 73faadb388e4d50bb5b6ef87c9c42f37
- Child Cost Item: f8e93f090f7220f294936a5b6639b4c2
- Child Cost Item: 7ef0e8a82a3e1191cb103e372056851c
- Child Cost Item: ac62a80e9e00ffb0f325ee882ca76c97
- Child Cost Item: 40af1b609d5f0bd053a57ebb0b84ae48
- Child Cost Item: e8b8f83cc3e46054c3ebed8bc824ca8e