Major T&E Investment
Abstract
This program funds the development and acquisition of major developmental test instrumentation for the U.S. Army Test and Evaluation Command's (ATEC) test activities: White Sands Test Center (WSTC), NM; Yuma Test Center, (YTC), AZ; Aberdeen Test Center (ATC), MD; Electronic Proving Ground (EPG), AZ; Redstone Test Center (RTC), AL; and for the Reagan Test Site (RTS) at the U.S. Army Kwajalein Atoll (USAKA), which is managed by the Space and Missile Defense Command. The program also funds development and acquisition of Operational Test Command's (OTC) major field instrumentation. Requirements for instrumentation are identified through a long range survey of project managers, Research Development and Engineering Centers (RDECs), and Battle Laboratories developing future weapon systems and the test programs that support these systems. Army testing facilities are also surveyed to determine major testing capability shortfalls.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2017
- Source ID
- 0604759A_6_2040_PB_2017
- Change Summary Explanation
- FY 2017 Budget adjustments in the amount of $29.534 million dollars was the result of a change in Army Test Evaluation Center's (ATEC) priority of requirements. Range Radar Replacement Program (RRRP), was increased by $23.090 million to continue Engineering Manufacturing Development (EMD) based on modifications in FY 2016 for the Fly-out and Close-in Radars systems in preparation for replacement of equipment at Aberdeen Test Center (ATC), Redstone Arsenal Center (RTC), White Sands Test Center (WSTC), and Yuma Test Center (YTC). Real Time Casualty Assessment (RTCA), also known as Integrated Live Virtual Constructive Test Environment (ILTE), was increased by $7.000 million to continue the development of hardware, software, interfaces, and new capabilities to ensure RTCA/ILTE requirements for upcoming operational tests are satisfied. The remainder of the Adjustments to Budget Years ($-556K) represents top loaded inflation rate adjustments.
- Service Agency Name
- Army
Entities
Organizations
- United States Army
Related Documents
- Child Project: Reagan Test Site (RTS) T&E Investments
- Child Accomplishment: Radar Open Systems Architecture Refresh
- Child Accomplishment: Radar Reliability Improvement Program (RRI).
- Child Accomplishment: Telemetry (TM) Modernization Study.
- Child Accomplishment: Multiple Simultaneous Engagement (MSE) Flight Safety.
- Child Accomplishment: Legacy Servo Upgrade Program.
- Child Accomplishment: Mission Data Network (MDN) Modernization.
- Child Accomplishment: RTS Automation and Decision Support.
- Child Accomplishment: TRADEX L-Band Modulator
- Child Accomplishment: Net Centric Operations Upgrade
- Child Accomplishment: Transmitter Reliability Improvements
- Child Accomplishment: Optics Focal Plane Technology Replacement Study
- Child Accomplishment: Legacy Radar Replacement Study
- Child Accomplishment: Self healing software and algorithms
- Child Accomplishment: Range in a box - simulation over live study
- Child Accomplishment: Multi-Statics for Radars and Telemetry - Prototype
- Child Accomplishment: Ground Based Discrimination Radar
- Child Project: Major Developmental Testing Instrumentation
- Child Accomplishment: Engineering and Manufacturing Development (EMD) phase contract activity for the Range Radar Replacement Program (RRRP).
- Child Accomplishment: Engineering and Manufacturing Development (EMD) phase contract activity for the Electromagnetic Environmental Effects (E3) Systems Modernization (EMRE) project.
- Child Accomplishment: Engineering and Manufacturing Development (EMD) phase contract activity for the Nuclear Effects Test Capability Modernization.
- Child Accomplishment: Engineering and Manufacturing Development (EMD) phase contract activity of the Common Range Integrated Instrumentation System (CRIIS) Objective Program.
- Child Accomplishment: Engineering and Manufacturing Development (EMD) phase contract activity of the Test Network Modernization Program.
- Child Accomplishment: Engineering and Manufacturing Development (EMD) phase contract activity for Robotics/UAS Instrumentation Suite
- Child Accomplishment: Engineering and Manufacturing Development (EMD) phase contract activity for the Applied Environments Modernization program.
- Child Accomplishment: Engineering and Manufacturing Development (EMD) phase contract activity for the Telemetry Systems Modernization program
- Child Accomplishment: Engineering and Manufacturing Development (EMD) phase contract activity for the Future Wireless Network program.
- Child Accomplishment: Engineering and Manufacturing Development (EMD) phase contract activity for System of Systems Cooperative Engagement Test Infrastructure (SCETI)
- Child Accomplishment: Engineering and Manufacturing Development (EMD) phase contract activity for the Systems Test and Integration Laboratory (STIL).
- Child Project: Major Operational Test Instrumentation
- Child Accomplishment: Project name changed from Real-Time Casualty Assessment (RTCA) to Integrated Live-Virtual-Constructive (LVC) Test Environment (ILTE).
- Child Project: Range Radar Replacement Program (RRRP)
- Child Accomplishment: Engineering and Manufacturing Development (EMD) Phase Contract Activity
- Child Project: Warrior Injury Assessment Manikin (WIAMan)
- Child Accomplishment: Warrior Injury Assessment Manikin (WIAMan) Anthropomorphic Test Device (ATD)