Project name changed from Real-Time Casualty Assessment (RTCA) to Integrated Live-Virtual-Constructive (LVC) Test Environment (ILTE).

Abstract

Transition from Technology Maturation and Risk Reduction (TMRR) Phase to EMD Phase and acquisition of ILTE capabilities required to conduct Operational Tests.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2017
Source ID
60240acd399eaf5f0eac3b802dc93c2d

Tags

Readers

  • Aerospace Engineering.
  • Critical Infrastructure Protection in CBRN and WMD Threats.

Related Documents