Air Vehicle - Tech Refresh 3
Abstract
Technology Refresh 3 (TR-3) conducts post Critical Design Review (CDR) design activities. This effort will develop and deliver a TR-3 system through full flight-worthy certification and production readiness review for Lot 15. The design of TR-3 subsystems Integrated Core Processor (ICP), Aircraft Memory System (AMS), and Panoramic Cockpit Display Electronics Unit and Display Unit (PCD-EU, PCD-DU) configurations will contain new backplane technology, commercial operating systems, and modified middleware necessary to support Block 3F functionality and incorporation of all Block 4 capabilities. This work includes nonrecurring engineering for the development, test, and certification of the ICP, AMS, PCD-EU, and PCD-DU, and includes processing capacity to ensure long term viability for future capabilities. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F. In FY23, $63.6M was expended for civilian pay expenses in this project element, and in FY24, $67.1M is forecasted for civilian pay expenses in this project element.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2025
- Source ID
- 673501_0604840F_7_3600_PB_2025
Related Documents
- Root: F-35 C2D2
- Child Accomplishment: Technology Refresh 3 (TR-3)
- Child Cost Item: 545c0957b8f66aeeb7e1e9a59342463c
- Child Cost Item: c7e61d7a5cbbb949f3a73f9913d38ed9
- Child Cost Item: 9c9f2993d062e760679adaa2529b0197
- Child Cost Item: 07201c53ac89f1f639828c8f609b2a22