Bomber Tactical Data Link
Abstract
The B-52 Combat Network Communications Technology (CONECT) Capability Development Document (CDD), dated 18 March 2004, captures the requirements for a Tactical Data Link (TDL) capability on the B-52. The B-52 TDL, provides low latency, jam-resistant situation awareness and command and control communications needed to support in-theater operations and missions. This project will consist of integrating an existing off-the-shelf Link 16 terminal into the B-52. Integration includes Group A wiring, rack and antenna, and the Group B terminal Line Replaceable Unit (LRU). The TDL terminal will be fully integrated with CONECT. This Line-Of-Sight (LOS) Link 16 capability allows the warfighter to utilize this capability by maintaining situational awareness, avoiding threats and employing an array of weapons. Funds may be used to address emerging and short-notice Diminishing Manufacturing and Material Shortage (DMSMS) issues. As the Link-16 upgrade brings additional capability to the B-52, emerging security requirements (JRE messaging, crypto modernization, etc.) as well as other aircraft upgrades (1760 IWB, Mode S/Mode 5, IFF, BSB updates, RMP, Re-Engining, etc) may require study/support for potential impact to the CONECT and Link-16 system. Funds may be used for Engineering Development Models (EDMs), test, and field terminals. DMS efforts to include removal of end-of-life software/hardware within simulators systems and move to a modular, common open system architecture that is sustainable and cyber-resilient. Implement requirements and standards defined under the Simulator Common Architecture Requirements and Standards (SCARS) initiative. Funds may be used to resolve emerging safety of flight and diminishing manufacturing sources issues, accommodate technology insertion and fulfill FAA or other mandates necessary to ensure continued aircrew safety and mission effectiveness. This program element may include necessary civilian pay expenses required to manage, execute, and deliver B-52 weapon system capability. BA7- This project is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2018
- Source ID
- 675041_0101113F_7_3600_PB_2018
Related Documents
- Root: B-52 SQUADRONS
- Child Accomplishment: Bomber Tactical Data Link