MULTISYSTEM TEST EQUIPMENT

Abstract

Factory production commenced during this quarter on standard printed circuits for the computer in the electronic test set. Factory production of other MTE system hardware is starting. During this quarter, 18 standard types of millimodules and 16 standard types of millimodule boards were designed and released for production. Other items are being readied for release to production. Drawings were completed for the rack and chassis mechanical configurations. The rack detail drawings will be completed when the environmental design tests, started this quarter, have been completed. A shelter-rack interface has been developed. Final modifications will be made when shock and vibration tests, started this quarter, have been completed. Extensive detailed design work is continuing on the electronic test set equipment. Layouts have been finalized and circuits are being designed for the display/control equipment. Extensive design, breadboarding, and testing work has been accomplished on all of the other units comprising the electronic test groups. Preliminary work on software for the computer has commenced. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 15, 1963
Accession Number
AD0410491

Tags

Communities of Interest

  • Advanced Electronics
  • Energy and Power Technologies
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Aircrafts
  • Amplitude Modulation
  • Circuit Boards
  • Computer Programming
  • Control Systems
  • Digital Circuits
  • Employment
  • Filtration
  • Frequency Synthesizers
  • Measurement
  • Modulators
  • Repetition Rate
  • Test And Evaluation
  • Test Equipment
  • Transducers
  • War Colleges
  • Wiring Diagrams

Readers

  • Clinical Trial Research.
  • Software Engineering

Technology Areas

  • Microelectronics
  • Microelectronics - Microelectromechanical Systems