GROUND-TO-AIR TRANSMITTER, ESS INSTALLATION MANUAL
Abstract
This manual documents the installation of an experimental ground-to-air transmitter-receiver facility (GATR) for SAGE weapons control. The manual is divided into three chapters: Chapter 1-- Concept and Design; Chapter 2- Installation and Functional Description; Chapter 3- Equipment specifications. Each chapter is designed for a different purpose and is self-sufficient. Chapter 1 explains the purpose, history, and overall function of the GATR installation; Chapter 2 summarizes the overall design and describes the installation and interconnection of the functional units; Chapter 3 presents the electrical details of the MITRE-designed or modified equipment and gives the designation of government furnished and commercial equipment.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1960
- Accession Number
- AD0411790
Entities
Organizations
- MITRE Corporation