Development of an Elevated Causeway - Surf Tests
Abstract
Tests were performed to determine the feasibility of erecting an elevated pontoon causeway in the surf zone of an open beach. Ammi pontoons, measuring 90x28x5 feet, served as test vehicles. Techniques for installing an elevated causeway in a surf environment were evaluated; functions requiring refinement and/or further development were identified. Two independent tests were performed - one at the beach interface and one in 20 feet of water approximately 300 feet from shore. Estimates of time, manpower, and equipment required to erect an elevated causeway were derived from the experiment.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1971
- Accession Number
- AD0735447
Entities
People
- Billy R. Karrh
Organizations
- Naval Facilities Engineering Service Center