FPS-85 TUBE IMPROVEMENT PROGRAM 4CPX250K
Abstract
A production refinement program for improving the performance, reliability and life of the tube type 4CPX250K was conducted. The objective set for this program was to be able to produce a tube that would operate in the radar set AN/FPS-85 for a minimum of 4000 hours with a maximum of 10 arcs, and a power decrease of not more than 3db during that time. The investigation included mechanical and electrical aspects, as well as a cathode investigation, and a computer analysis of cathode current density as a function of the electrode alignment. Processing procedures and exhaust schedules were also investigated. As a result of this contract eight tubes in the power-gain test equipment have been operating over 2000 hours satisfactorily. Conclusions regarding methods of improving the 4CPX250K are made. These improvements have been implemented into the tube design. Recommendations for further action are made.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1967
- Accession Number
- AD0828569
Entities
People
- Maurice L. Mullin
- Robert D. Culbertson