10D Countdown Operations Mercury HS 36-1

Abstract

This report contains the operational countdown checklist (from T-180 minutes to liftoff) for readiness and launch procedures for the 10D Mercury launch vehicle and associated support equipment. The countup procedures for securing the launch area and related equipment are also reported.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 27, 1959
Accession Number
AD0834019

Entities

Organizations

  • General Dynamics

Tags

DTIC Thesaurus Topics

  • Check Valves
  • Circuit Breakers
  • Compressors
  • Control Systems
  • Engineers
  • Engines
  • Flight Control Systems
  • Heat Exchangers
  • National Security
  • Recording Systems
  • Safety
  • Safety Belts
  • Switches
  • Test Stands
  • Two Dimensional
  • United States
  • Valves

Fields of Study

  • Physics

Readers

  • Logistics and Supply Chain Management.
  • Missile Defense Systems.
  • Thermal Physics or Thermal Science.