For Transistorized Transmitter for AN/SQS-26 (XN-2) Sonar Equipment.
Abstract
This report describes the progress on the contract during the period 1 July to 30 December 1961. During this period work was performed on the system described in the Recommendation Report that was submitted as part of the Fourth Interim Engineering Report. Authority to proceed with Phase III of the project was received. New circuits were developed and evaluated. (Author)