Application and Evaluation of Fully Proceduralized Job Performance Aids and Task Oriented Training Technologies.
Abstract
This report concerns the effectiveness of a combined application of the Fully Proceduralized Job Perforfmance Aid (FPJPA) and Job Oriented Training (JOT) technologies for Navy maintenance personnel with medium electronic aptitudes. FPJPAs were developed for the AN/AQA 7 Sonar Signal Processing System, a system installed in the S2G and P-3 series aircraft. These FPJPAs were developed in keeping with the draft specification and guidance documents of AFHRI-TR-71-53 (I, II, III, AD-740 903, AD-744 044 and AD-744 817) for both non-troubleshooting (non-TS) and troubleshooting (TS) tasks, for both organizational (O) and intermediate (I) levels of maintenance. Two Job Oriented Training (JOT) programmed packages were also developed to support these FPJPAs - a 13-week program for 'O' level subjects and a 16-week program for 'I' level subjects. These JOT programs were substantially shorter than entry training with for 'O' level maintenance was 24 weeks and for 'I' level maintenance 36 weeks. These traditional electronic maintenance programs are successfully completed only by personnel of very high aptitude. The 'O' level JOT program was administered to one group of 15 medium aptitude subjects and the 'I' level program to two groups of 13 medium aptitude subjects.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1978
- Accession Number
- ADA072482
Entities
People
- Charles J. Theisen
- Robert P. Fishburne Jr.
- Thomas J. Elliott
Organizations
- Naval Air Warfare Center Warminster