Jadwin Dam Condition Report. Dam, Outlet Works & Spillway Periodic Inspection Report Number 4. Lackawaxen River Basin, Dyberry Creek, Pennsylvania.

Abstract

This inspection report presented the results of the fourth periodic inspection, instrumentation readings and remedial measures adopted by the Philadelphia District Corps of Engineers on Jadwin Dam, Pa. located on Dyberry Creek. No major areas of concern were noted by the inspection team. Instrumentation installed to date was found to be currently operational and adequate to measure performance of the dam. It was recommended that piezometeric and visual data be obtained during periods of high water. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1980
Accession Number
ADA098782

Entities

Organizations

  • Philadelphia District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Civil Engineering
  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Elevation
  • Embankments
  • Engineering
  • Engineers
  • Groundwater
  • Inspection
  • Instrumentation
  • Pennsylvania
  • Piezometers
  • Spillways
  • Stilling Basins
  • Structural Analysis

Readers

  • Aerospace Test and Evaluation
  • Hydrologic Risk Analysis and Mitigation.