The Columbia River and Tributaries Study, Interim Report, Yakima-Union Gap Flood Damage Reduction, Yakima River Basin, Washington.
Abstract
There are six basic components of the proposed plan for flood damage reduction, four of which are levee improvements and two are control structures. Project construction will take approximately 15 months to complete. This report defines the environmental settings of Yakima-Union Gap area and analyzes the impacts of the proposal project; most of which are identified as short-term impacts. (Author)