Multiple-Purpose Project, Kansas River Basin, Republican River, Kansas, Milford Lake Operation and Maintenance Manual. Appendix IV. Construction Foundation Report. Revision.

Abstract

The purpose of this report is to present a complete record of the geology and foundation conditions encountered during construction of dam. The report focuses primarily on the foundations of the outlet works, right abutment, and spillway area where the bulk of rock foundations are involved.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1983
Accession Number
ADA137721

Entities

People

  • R. Griffith
  • S. D. Markwell
  • V. Anderson

Organizations

  • United States Army Corps of Engineers

Tags

Communities of Interest

  • Air Platforms
  • Counter IED
  • Human Systems

DTIC Thesaurus Topics

  • Ammonium Nitrate
  • Concrete
  • Construction
  • Construction Materials
  • Drainage Basins
  • Engineers
  • Excavation
  • Explosives
  • Gages
  • Groundwater
  • Materials
  • Materials Laboratories
  • Plastic Explosives
  • Pressure Gages
  • Pressure Testing
  • Regions
  • Rocket Oxidizers

Readers

  • Business Analytics
  • Geotechnical Engineering.
  • Hydrologic Risk Analysis and Mitigation.