Deployment Area Selection and Land Withdrawal/Acquisition. M-X/MPS (M-X/Multiple Protective Shelter) Environmental Technical Report. Lincoln County, Nevada.
Abstract
On October 2, 1981, the President announced his decision to complete production of the M-X missile, but cancelled the M-X Multiple Protective Shelter (MPS) basing system. The Air Force was, at the time of these decisions, working to prepare a final Environmental Impact Statement (FEIS) for the MPS site selection process. These efforts have been terminated and the Air Force no longer intends to file a FEIS for the MPS system. However, the attached preliminary FEIS captures the environmental data and analysis in the document that was nearing completion when the President decided to deploy the system in a different manner. Document contains: Detailed Tables for Lincoln Country, Nevada. Information covers: Population, labor force, employment, and unemployment, 1968-1980, in Lincoln Country, Nevada; Personal income by major sources; Local government finance impact; and School district revenues and expenditures.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 02, 1981
- Accession Number
- ADA149892
Entities
Organizations
- Henningson Durham Richardson