National Program for Inspection of Non-Federal Dams. Hamilton Reservoir Dam MA 00536, Thames River Basin, Holland, Massachusetts. Phase I Inspection Report.

Abstract

The dam is an earthfill embankment and concrete spillway dam. It is about 100 ft. long and has a maximum height of 17 ft. The project is considered to be in good condition. It is intermediate in size with a significant hazard potential. It is recommended that the owner retain a competent consulting engineer to conduct further studies to determine the measures that are necessary to improve the discharge capacities.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1978
Accession Number
ADA154344

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Inspection
  • Inventory
  • Massachusetts
  • New England
  • Riprap
  • Spillways
  • United States
  • Visual Inspection
  • Warning Systems

Readers

  • Hydraulic Engineering.