National Program for Inspection of Non-Federal Dams. Eclipse Dam MA 00279, Hoosic River Basin, North Adams, Massachusetts. Phase I Inspection Report.

Abstract

Eclipse Dam includes a concrete gravity dam and spillway about 260 ft. long having a maximum height of 51.5 ft. The dam is in good condition, The size of the dam is intermediate and the hazard potential is high. An investigation is recommended to determine the ability of the structure to withstand overtopping during peak flows in the magnitude of the test flood.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1980
Accession Number
ADA154701

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Concrete
  • Construction
  • Dams
  • Drainage Basins
  • Engineering
  • Engineers
  • Flood Control
  • Maintenance
  • Masonry
  • Massachusetts
  • Materials
  • New England
  • New York
  • Plants
  • United States
  • Visual Inspection
  • Warning Systems

Readers

  • Hydrologic Risk Analysis and Mitigation.
  • Space Exploration and Orbital Mechanics.