National Program for Inspection of Non-Federal Dams. Central Street Dam (MA 00340), Sudbury River Basin, Framingham, Massachusetts. Phase I Inspection Report.
Abstract
Central Street Dam is a 24 foot high composite masonry and earth dam consisting of a 182 foot wide masonry spillway forming the right half o the dam, a 40 foot long by 15 foot wide masonry/earth retaining wall section located just to the left of the spillway. The dam is classified as small in size with a high hazard potential. The dam is in fair condition.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1980
- Accession Number
- ADA154720
Entities
Organizations
- New England District, U.S. Army Corps of Engineers