National Program for Inspection of Non-Federal Dams. Central Street Dam (MA 00340), Sudbury River Basin, Framingham, Massachusetts. Phase I Inspection Report.

Abstract

Central Street Dam is a 24 foot high composite masonry and earth dam consisting of a 182 foot wide masonry spillway forming the right half o the dam, a 40 foot long by 15 foot wide masonry/earth retaining wall section located just to the left of the spillway. The dam is classified as small in size with a high hazard potential. The dam is in fair condition.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1980
Accession Number
ADA154720

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Bodies Of Water
  • Construction
  • Dams
  • Diameters
  • Drainage Basins
  • Earth Dams
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Flood Damage
  • Floods
  • Massachusetts
  • New England
  • Retaining Walls
  • United States
  • Visual Inspection

Readers

  • Hydraulic Engineering.