National Program for Inspection of Non-Federal Dams. Houghton Pond Dam (MA 00444), Charles River Basin, Holliston, Massachusetts. Phase I Inspection Report.
Abstract
This dam consists of an earth embankment approximately 90 ft. in length, a 29.2 ft. long stone masonry auxiliary spillway and a 6.9 ft. long concrete spillway (outlet) structure controlled by stoplogs. The maximum height of the dam is 9.5 ft. The dam is in fair condition, based on visual examination. It has a classification of small and a potential hazard of significant. A professional engineer should be hired by the town to investigate certain deficiencies of the dam.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1979
- Accession Number
- ADA154892
Entities
Organizations
- New England District, U.S. Army Corps of Engineers