Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 3. Photographs, pages 60 thru 136.

Abstract

Contents: Concrete Structure: Monolith D-1 - D-17 and Powerhouse; Stilling Basin Wall; Splitter Wall; Tailrace Wall; Stilling Basin; Tailrace.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1984
Accession Number
ADA160527

Entities

Organizations

  • St. Louis District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Concrete
  • Construction
  • Contracts
  • Elevation
  • Embankments
  • Engineers
  • High Angles
  • Photographs
  • Photography
  • Standards
  • Stilling Basins

Readers

  • Business Analytics
  • Hydraulic Engineering.