Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 3. Photographs, pages 60 thru 136.
Abstract
Contents: Concrete Structure: Monolith D-1 - D-17 and Powerhouse; Stilling Basin Wall; Splitter Wall; Tailrace Wall; Stilling Basin; Tailrace.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1984
- Accession Number
- ADA160527
Entities
Organizations
- St. Louis District, U.S. Army Corps of Engineers