Naval Station Mayport Project Execution Plan.

Abstract

In early April 1985, SOUTHNAVFACENGCOM will undertake the installation of three fleet moorings about eight miles west of the Naval Station (NAVSTA) Mayport, Florida in the St. Johns River. These will be free-swinging hurricane type moorings to be used to moor YD, YC, barges, and other harbor craft. This execution plan has been developed to establish the responsibilities of participating organizations and to provide guidelines/procedures to be followed during the accomplishment of this project. This plan includes mooring description and a bill of materials; installation procedures; the personnel skills, material, and equipment required to successfully complete the installation; and the post installation testing and inspection requirements. Keywords: Fleet moorings.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1985
Accession Number
ADA168460

Entities

Organizations

  • Naval Facilities Engineering Systems Command

Tags

Communities of Interest

  • Air Platforms
  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Assembly
  • Birds
  • Construction
  • Construction Equipment
  • Contractors
  • Engineering
  • Engineers
  • Failure Mode And Effect Analysis
  • Liquid Crystal Displays
  • Materials
  • Measurement
  • Naval Shore Facilities
  • Pull Tests
  • Safety
  • Safety Equipment
  • Underwater Construction
  • Voltmeters

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Maritime and Naval Warfare Studies
  • Organizational Process Management (OPM).