Proceedings: CE (Corps of Engineers) Workshop on Design and Operation of Selective Withdrawal Intake Structures Held in San Francisco, California on 24-28 June 1985.
Abstract
Contents: Selective Withdrawal: Basic Concepts; Hydraulic Design of the Selective Withdrawal Structures of the Lost Creek Dam; Hydraulic Design of the Selective Withdrawal Structures of the Applegate Dam; Hydraulic Design of the Selective Withdrawal Structures at the Elk Creek Dam; Reservoir Regulation and Selective Withdrawal in Oregon; Operation of Selective Withdrawal Facilities Libby Dam, Montana; Alternatives for Improving Reservoir Water Quality; A Review of Selective Withdrawal Performance in the Fort Worth District; Modeling of Selective Withdrawal Intake Structures; Bloomington Dam, Potomac River Water Quality Outlet; Water Quality Outlet Warm Springs Dam; Hydraulic Design: Bloomington Lake and F. E. Walter Dam Projects', Selective Withdrawal Structures; Determination of Selective Withdrawal System Capacity for Intake Tower Design; Select: The Numerical Model; Blending in a Single Wet Well; Design of Selective Withdrawal Intake Structures; Operational Tools: Selective Withdrawal and Daily Operational Strategy; Operational Tools: Optimal Control of Reservoir Water Quality; Field Measurements at Intake Structures; Thoughts and Considerations for Hydraulic Design; Selective Withdrawal Needs for Lake Greeson, Arkansas Intake Structure; Selective Withdrawal Structure Operation Experiences; Overview of Pittsburgh District Selective Withdrawal Operation Experiences.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1986
- Accession Number
- ADA169370