Development of Milestone Schedules for Selected Logistics Support Directorate Programs. Appendix C. HTPM Schedules (After Feasibility Assessment).

Abstract

The Logistics Support directorate is responsible for numerous developmental programs requiring comprehensive milestone schedules to guide programs through the Army's extensive materiel acquisition cycle. Schedules are developed using micro-computers to assist Project Engineers with the management of key activities. The objective of this effort was to develop milestone schedules for selected developmental programs. Examples were generated for use by Project Engineers when they develop future milestone schedules. The document also includes examples of a data request form to extract data from Project Engineers and a user's manual for data base management. Keywords: Acquisition milestone schedules, Acquisition management, Data base development, Reverse osmosis water purification unit, Petroleum laboratory, Trident II boxcar, Self deployable cargo handler.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 15, 1987
Accession Number
ADA185812

Entities

People

  • Arthur A. Narro
  • Bruce B. Halstead
  • Jerri Y. Gist
  • Kurt A. Kladivko
  • Thomas J. Fidd

Organizations

  • Leidos

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Classification
  • Combat Vehicles
  • Control Systems
  • Databases
  • Engineering
  • Engineers
  • Logistics
  • Logistics Support
  • Military Operations
  • Plastic Explosives
  • Reverse Osmosis
  • Security
  • Supply Chain Management
  • Virginia
  • Water Purification

Fields of Study

  • Engineering

Readers

  • Life Cycle Cost Analysis
  • Logistics and Supply Chain Management.