Full-Scale Incineration System Trial Burns at the Naval Battalion Construction Center, Gulfport, Mississippi. Volume 4. Incinerator Availability

Abstract

This technical report is divided into eight volumes. This portion of the report comprises Volume V, Incinerator Availability. This volume describes the methods used to collect availability data. It presents an evaluation of the data collected, and discusses the items (components) that contributed to the availability of the incinerator. It provides a general background section, a brief description of the process equipment, the planning and implementation used to collect availability data, field operations and field data, an incinerator availability evaluation, and specific incinerator component inspection conclusions and recommendations.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1991
Accession Number
ADA251931

Entities

People

  • J. A. Cook

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Air Pollution
  • Bricks
  • Carbon Monoxide
  • Combustion
  • Combustion Chambers
  • Computer Programs
  • Construction
  • Databases
  • Department Of Defense
  • Dielectric Gases
  • Failure Mode And Effect Analysis
  • Gases
  • Test And Evaluation
  • Test Equipment
  • United States
  • United States Government

Readers

  • Business Analytics
  • Environmental Engineering.