Preliminary Engineering Design Package for the North Boundary System Improvements Interim Response Action.

Abstract

This interim response action consists of the design and construction of improvements to the North boundary containment system. The purpose of this document is to outline the main elements developed in the preliminary design phase of the IRA. The following elements of the IRA are discussed: (1) Recharge trenches. (2) Well closure. (3) Design flow rate. (4) Existing ground water treatment process. (5) Treatment system modifications. (6) Additional carbon storage. (7) Building modifications. (8) Treatment plant operational improvements.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1989
Accession Number
ADA295224

Tags

Communities of Interest

  • Biomedical
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Abstracts
  • Boundaries
  • Construction
  • Cost Estimates
  • Engineering
  • Filters
  • Flow Rate
  • Flowmeters
  • Groundwater
  • Hypervelocity Flow
  • Instrumentation
  • Maintenance
  • Rocky Mountains
  • Stainless Steel
  • Standards
  • Storage Tanks
  • Test Methods

Readers

  • Business Analytics
  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Geotechnical Engineering.