Implementation Document for Rail Classification Yard/Motor Pool Area IRA. Volume 1. General. Volume 2. Specifications.

Abstract

The interim response action for the rail classification yard/motor pool area will include: (1). Ground water extraction systems in the alluvial channels of the rail yard and motor pool areas. (2). Pipeline to transport the extracted water to the irondale containment system treatment facility. (3). Modifications to the treatment facility to allow for the additional flow. Volume 1 of this implementation document contains: (1). Mou between the army and shell concerning shell's participation in the IRA's. (2). Construction work plan. (3). Cost estimates. (4). Task specific health and safety plan.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1991
Accession Number
ADA295518

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies
  • Ground and Sea Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acceptability
  • Ceramic Materials
  • Construction
  • Control Systems
  • Engineers
  • Groundwater
  • Health Services
  • Material Degradation Processes
  • Materials Laboratories
  • Materials Processing
  • Materials Testing
  • Mechanics
  • Medical Personnel
  • Occupational Safety And Health
  • Structural Loads
  • Test And Evaluation
  • Test Equipment

Readers

  • Environmental Remediation and Restoration.
  • Riverine Ecology