Installation Restoration Program, Construction Report for Interim Remedial Action and Treatability Study for Indian Mountain Long Range Radar Station, Alaska.

Abstract

This Final Construction Report is provided under Contract No. F41624-94-D-8046-OOO4, between the U.S. Air Force and Jacobs Engineering Group Inc.The purpose of this report is to describe and detail the activities conducted as part of the Interim Remedial Action and Treatability Study at Indian Mountain Long Range Radar Station. Alaska. This report contains five sections. Section 1.0 provides introduction and background information, and describes general tasks completed. Section 2.0 describes the construction activities. section 3.0 presents the environmental sampling results and data evaluation for the two tasks. Conclusions and final recommendations are in Section 4.0. Section 5.0 lists references cited in the report. (AN)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 11, 1995
Accession Number
ADA302313

Entities

Organizations

  • Jacobs Engineering Group

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Air Force
  • Civil Engineering
  • Composite Materials
  • Construction
  • Contracts
  • Detection
  • Engineering
  • Environmental Protection
  • Field Tests
  • Hydrocarbons
  • Organic Compounds
  • Radar Stations
  • Stations
  • Test And Evaluation
  • Three Dimensional
  • Volatile Organic Compounds
  • Waste Management

Readers

  • Business Analytics
  • Environmental Remediation and Restoration.