Manufacturing Processes for Fabricating Graphite/PMR-l5 Polyimide Structural Elements.
Abstract
This report documents work performed by BAC for the National Aeronautical and Space Administration, under NAS1-15009 Tasks A through H. The objective of this program was twofold: first, to develop processes and the required quality assurance methods and controls for fabricating Graphite/PMR-15 Polyimide Structural Elements; second, the demonstration of those processes and controls through the fabrication of major composite structural elements.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 01, 1979
- Accession Number
- ADA302479
Entities
People
- C. H. Sheppard
- J. T. Hoggatt
- W. A. Symonds
Organizations
- Boeing