Energy Survey of Eisenhower Army Medical Center, Fort Gordon, Augusta, Georgia. Volume 2. Appendices.

Abstract

1.1 Perform a complete energy audit of the entire Army Medical Center's (AMC) heating and cooling systems, lighting system, and other systems and areas as indicated in Annex A. 1.2 Perform a comprehensive analysis of all data collected during the audit. 1.3 Identify all Energy Conservation Opportunities (ECO's) including low cost/no cost ECO's and perform complete evaluations of each. Energy equipment replacement projects already underway, approved, or planned by the Medical Center staff will be factored into the evaluations. 1.4 Prepare programming documentation for all Federal Energy Management Program (FEMP) and/or Energy Conservation Improvement Program (ECIP) projects. 1.5 Prepare implementation documentation and instructions for those projects recommended for accomplishment by local forces. 1.6 List and prioritize all recommended ECO's. 1.7 Prepare a comprehensive report which will docwnent the work accomplished, the results of the field investigation and engineering analysis, the conclusions, and recommendations.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 23, 1996
Accession Number
ADA330716

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies
  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Business Administration
  • Chemistry
  • Cooling
  • Energy Conservation
  • Energy Consumption
  • Energy Management
  • Health Services
  • Heat Loss
  • Load Monitoring
  • Management Personnel
  • Measurement
  • Medical Personnel
  • Optics
  • Organizational Structure
  • Test Methods
  • Therapy
  • Visible Spectra

Readers

  • Business Analytics
  • Energy Conservation and Renewable Energy Engineering.