Access Study to All Pertinent Parts of Dam Projects During High Reservoir Conditions. Upper Connecticut River Basin, New Hampshire and Vermont.

Abstract

This report evaluates existing access routes to pertinent parts of completed Corps of Engineers dams in the Upper Connecticut River Basin during high reservoir conditions and makes recommendations for improved access when adequate access is not available. Seven dams in the Upper Connecticut River Basin were investigated; Union Village Dam, North Hartland Lake, North Springfield Lake, Ball Mountain Lake, Townshend Lake, Surry Mountain Lake, and Otter Brook Lake. Each project was studied to evaluate the adequacy of the existing emergency access routes to the embankment crests, downstream toes of the dam and dike embankments, the emergency spillways, and outlet works. Two general conditions were evaluated that would require emergency access: (1) uncontrolled seepage at the downstream toe of a dam or dike embankment, and (2) failure of rock cut slopes causing blockage of spillway or outlet works channels. Condition number one was considered to be more severe because it would pose a structural threat. Access to some features was found to be inadequate. However, in some cases, existing access, although not meeting design criteria, was judged to be acceptable at this time.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1992
Accession Number
ADA336742

Entities

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Connecticut
  • Connecticut River
  • Construction
  • Cost Estimates
  • Dams
  • Design Criteria
  • Drainage Basins
  • Earth Fills
  • Embankments
  • Emergencies
  • Engineers
  • Excavation
  • Flood Control
  • Mountains
  • New England
  • New Hampshire
  • Spillways

Readers

  • Cybersecurity.
  • Hydraulic Engineering.