Transonic Compressor Test Rig Rebuild and Initial Results with the Sanger Stage

Abstract

The NPS Transonic Compressor Test Rig was rebuilt and initial testing was conducted on the Sanger Stage, which was designed using CFD techniques. Improvements to the existing monitoring equipment, test rig instrumentation, and data acquisition software were all made in preparation for testing. A Plexiglas casewall was chosen to accommodate pressure-sensitive paint measurements. Wall heating was used to control tip-clearance. The initial performance data, to 70% design speed, were compared with predictions using a 3-dimensional viscous code.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 2000
Accession Number
ADA381019

Entities

People

  • Joseph M. O'brien

Organizations

  • Naval Postgraduate School

Tags

Communities of Interest

  • Air Platforms
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Clearances
  • Compressors
  • Computational Fluid Dynamics
  • Computers
  • Data Acquisition
  • Engineering
  • Gages
  • Instrumentation
  • Measurement
  • Performance Tests
  • Pressure Distribution
  • Pressure Measurement
  • Stagnation Pressure
  • Static Pressure
  • Strain Gages
  • Transducers

Fields of Study

  • Engineering

Readers

  • Aerodynamics.
  • Fluid Dynamics.
  • Software Engineering