End-to-End Test interim Report Phase 3

Abstract

The approach taken during the ETE Test Phase 3 was to migrate certain software components of VSTARS, specifically the air network interface unit (ANIU) and the radar processor simulator and integrator (RPSI), from the laboratory Alpha workstations to the primary mission equipment on the T3 E-8C aircraft. In addition, the ground network interface unit (GNIU) software would be separated from VS TARS and migrated to an Alpha workstation collocated with a satellite transceiver.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1999
Accession Number
ADA381057

Entities

People

  • Gary Marchand
  • Paul Hovey

Tags

Communities of Interest

  • Air Platforms
  • Biomedical
  • C4I
  • Electronic Warfare
  • Energy and Power Technologies
  • Ground and Sea Platforms
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Aircraft Equipment
  • Aircrafts
  • Artillery
  • Computer Programs
  • Data Links
  • Local Area Networks
  • Network Architecture
  • Organizational Structure
  • Radar
  • Radar Components
  • Reliability
  • Synthetic Aperture Radar
  • Test And Evaluation
  • Test Equipment
  • Test Facilities
  • Unmanned Aerial Vehicles
  • Warfare

Readers

  • Aerospace Engineering.
  • Aviation Safety and Air Traffic Management
  • Parallel and Distributed Computing.

Technology Areas

  • Space