End-to-End Test interim Report Phase 3
Abstract
The approach taken during the ETE Test Phase 3 was to migrate certain software components of VSTARS, specifically the air network interface unit (ANIU) and the radar processor simulator and integrator (RPSI), from the laboratory Alpha workstations to the primary mission equipment on the T3 E-8C aircraft. In addition, the ground network interface unit (GNIU) software would be separated from VS TARS and migrated to an Alpha workstation collocated with a satellite transceiver.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1999
- Accession Number
- ADA381057
Entities
People
- Gary Marchand
- Paul Hovey