Verification and Validation Report for the End-to-End Test. Phase 1
Abstract
This report provides the results of the verification and validation (V&V) tasks performed during Phase 1 of the Joint Advanced Distributed Simulation (JADS) End-To-End (ETE) Test. This report details the results of executing the V&V requirements listed within the ETE Test Activity Plan, Appendix C, Verification and Validation Plan for the ETE Test. Verification and Validation Tasks The V&V tasks that were performed during or prior to Phase 1 are described in the ETE Test Activity Plan, Appendix C, Verification and Validation Plan for the End-To-End (ETE) Test.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 2000
- Accession Number
- ADA381391