Townshend Lake: Periodic Inspection Report No. 4 West River Townshend, Vermont

Abstract

This inspection has been conducted under the authority in ER 1110-2-100, which provides for the "Periodic Inspection and Continuing Evaluation of Completed Civil Works Structures." The purpose of the inspection is to examine the physical condition of the Townshend Lake project as part of a continuing program to insure its structural stability, safety, and operational adequacy. The field examination includes soils and geologic aspects of embankments, channels, and other components, as well as structural, concrete, mechanical, electrical, and hydrologic and hydraulic features of the project.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1996
Accession Number
ADA382469

Entities

People

  • Carmen Suarez
  • Scott Acone

Organizations

  • New England District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Cyber
  • Human Systems
  • Sensors

DTIC Thesaurus Topics

  • Bulkhead Gates
  • Civil Engineering
  • Computers
  • Concrete
  • Construction
  • Control Systems
  • Detectors
  • Drainage Basins
  • Embankments
  • Engineering
  • Engineers
  • Flood Control
  • Geotechnical Engineering
  • Host Computers
  • Materials
  • Measurement
  • New England

Readers

  • Hydrologic Risk Analysis and Mitigation.
  • Systems Analysis and Design
  • Technical Research and Report Writing.