Dredging Research, Vol. 5, No. 2, Jun 2002

Abstract

The plan calls for a series of small pits, each pit receiving one year's discharge of dredged material. After one year of deposits, the pit will be capped to prevent loss of material and to encourage colonization by benthic organisms and fish. The pit will be capped with material excavated during construction of the new pit. Surficial sediments unsuitable for ocean disposal would be used for capping first. Then these deposits would be capped with clean material from the new pit. The clean sediment caps would also serve to remediate the unsuitable surface sediments, in addition to safely containing the dredged material and returning the area to its previous condition with no long-term loss of habitat or benthic communities.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 2002
Accession Number
ADA403804

Entities

Organizations

  • Engineer Research and Development Center

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Chemistry
  • Dredging
  • Ecotoxicology
  • Electronic Mail
  • Engineers
  • Environmental Pollutants
  • Excavation
  • Guidance
  • Materials
  • New Jersey
  • New York
  • North America
  • Open Water
  • United States
  • Water
  • Water Quality
  • Websites

Fields of Study

  • Environmental science

Readers

  • Environmental Remediation and Restoration.
  • Nanocomposite Materials Science
  • Riverine Ecology