Fancher Creek Dam, Fresno, California, Embankment Criteria and Performance Report
Abstract
The purpose of this report is to compare as-built properties of the dam with design criteria and assumptions and to document the earthwork construction activities of the project. In accordance with ER 1110-2-1901, this report provides pertinent embankment information which can be used to evaluate the performance and design of the structure along with providing guidance for the design and construction of comparable future projects. The report includes a summary record of significant design data, the design assumptions, computations, and a review of specification requirements. It is a permanent record to be used as a basis of analysis for maintenance work and any future problems which may arise. The construction equipment, procedures, field control test data, record test results and embankment performance are also covered in this text.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1994
- Accession Number
- ADA425242
Entities
Organizations
- Sacramento District, U.S. Army Corps of Engineers