Shakedown & Determination of Tunnel Control Settings for Refurbished Trisonic Gasdynamic Facility (TGF)
Abstract
The Trisonic Gasdynamic Facility (TGF) had refurbishment completed in 2005 after being put into mothball status ten years prior. Upgrades during refurbishment to the tunnel and the loss of the old operations staff required the need for an initial set of tunnels runs to determine how to operate the facility, rediscover the limitations of the facility, and determine the correlation between the old documented control settings and the new systems. This control calibration also served as the initial shakedown of the refurbished tunnel, allowing technicians and engineers to cycle the systems and discover the best practices for operation and unresolved or unknown problems with the system. The shakedown initiated the reliable and successful operation of the TGF for future ground testing experiments.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 2006
- Accession Number
- ADA466325
Entities
People
- Julie E. Saladin
Organizations
- Air Force Research Laboratory