Asbestos Survey for Fort Point US Coast Guard Station. Presidio of San Francisco. Volume 2
Abstract
R. L. Stollar and Associates, Inc. (RLSA) conducted an asbestos survey and bulk sampling of materials at the Fort Point U.S. Coast Guard Station (FPUSCGS) buildings to delineate the location and extent of asbestos-containing materials (ACM) at the facility. The U.S. Coast Guard Station is located on Presidio of San Francisco property along the San Francisco Bay. The facility consists of nine buildings ranging in size from 108 square feet (sq ft) to 8,852 sq ft, totalling 20,905 square feet. The survey was conducted in accordance with procedures outlined in TM5-612, Asbestos Control. Assessment of friable ACM was made using the worksheets included in the Guide for Asbestos Hazard Assessment in U.S. Army Facilities. From damage/risk and exposure values obtained from these worksheets, recommended management corrective actions were determined.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1991
- Accession Number
- ADA467908