Report on the Program and Contract Infrastructure Technical Requirements Development for the Guam Realignment Program
Abstract
The objective of this project was to review the development of program and contract infrastructure technical requirements for the Guam Realignment Program. The engineering review included cost estimates and budgets for the harbor, roads, power production and transmission, drinking water, wastewater, solid waste, and communications. Each infrastructure area had several government entities and projects involved; therefore, we referred the overall project as the composite program. Figure 1 shows the government entities and infrastructure areas that make up the composite program. The results of this review are findings and observation in the respective areas where issues were found. Findings are non-conformities which include recommendations. Observations are without recommendations or a required response. They are non-conformities, which fall outside the authority of the DOD IG to impose a recommendation, or noted concerns without a violation of a criteria.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 08, 2012
- Accession Number
- ADA557578
Entities
Organizations
- Office of the Inspector General, U.S. Department of Defense