Warfighter Information Network - Tactical (WIN-T) Increment 2: Second Follow-on Operational Test and Evaluation
Abstract
This report assesses the test adequacy, operational effectiveness, operational suitability, and survivability of the Warfighter Information Network Tactical (WIN-T) Increment 2 to support a Full-Rate Production decision scheduled for May 11, 2015. This report is the second follow-on assessment to the Director, Operational Test and Evaluation (DOT&E) WIN-T Increment 2 Initial Operational Test and Evaluation (IOT&E) Report dated September 2012. The IOT&E report supported the September 18, 2012, Full-Rate Production decision and the WIN-T Increment 2 Follow-On Test and Evaluation (FOT&E 1) Report dated September 2013, supported the September 19, 2013, Full-Rate Production decision. The Defense Acquisition Executive issued an Acquisition Decision Memorandum (ADM) on September 27, 2013, which directed the Army to conduct a second FOT&E (FOT&E 2) to demonstrate: (1) the Point of Presence (PoP) meets threshold reliability requirements; (2) significant reduction in the complexity of the start-up, reboot, troubleshooting, and shutdown procedures for the Soldier Network Extension (SNE) and PoP; (3) significant reduction in the complexity of the SNE Combat Net Radio (CNR) Gateway operations. The ADM directed that FOT&E 2 assess other deficiencies noted during FOT&E 1, including the Highband Networking Waveform (HNW) network and cybersecurity.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 2015
- Accession Number
- ADA621709
Entities
Organizations
- Office of the Secretary of Defense