Contingency Basing Infrastructure

Abstract

Note: Project EC9 efforts are complete in FY19. This project develops the tools and processes that will optimize recommendations for the materiel used to establish, operate, and maintain contingency bases. The project will increase the available knowledge at the base level and provide an analytical foundation for sound investment decision making. The continuous improvement modeling and simulation analysis tools will match the evolution of threats and technologies. Using a system of systems engineering approach, the Contingency Base Infrastructure Product Directorate's focus ensures optimum integration of materiel across the base camp to facilitate the maximizing of Warfighter effectiveness. CBI's analytical results will allow leadership to make data driven, informed decisions on the acquisition and employment/deployment of equipment. This enables contingency bases to be established, operated and managed as a system (system of systems) and the equipment acquired for the base to be compatible and efficient while providing the maximum overall support to the Warfighter. This approach supports Program(s) of Record (PORs) to maximize improvements in Operational Energy and ensures efficiencies across all Areas of Responsibility (AOR).

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2020
Source ID
EC9_0604804A_5_2040_PB_2020

Tags

Fields of Study

  • Engineering

Readers

  • Maritime Combat Support and Expeditionary Logistics.
  • Military Science and Technology Research and Modernization.
  • Software Engineering.

Related Documents