Logistics and Engineer Equipment - Eng Dev
Abstract
This Program Element (PE) provides system development and demonstration for various projects. This PE includes the development of water craft, military tactical bridging, material handling equipment, construction equipment, engineer support equipment, soldier support equipment (to include shelter systems, environmental control, field service equipment, camouflage systems and aerial delivery equipment), water purification equipment, petroleum distribution equipment, and mobile electric power. The FY 2020 funding request was reduced by $4.382 million to account for the availability of prior year execution balances.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2020
- Source ID
- 0604804A_5_2040_PB_2020
- Change Summary Explanation
- Service Agency Name
- Army
Entities
Organizations
- United States Army
Related Documents
- Child Project: Engine Driven Gen Ed
- Child Accomplishment: Power Distribution Illumination Systems Electrical (PDISE) expansion
- Child Accomplishment: Large Advanced Mobile Power Sources (LAMPS) Engineering & Manufacturing Development (EMD) Phase
- Child Cost Item: d58d5995cca6c7df5f94e32bb4cab2c1
- Child Cost Item: 24ca5391c624c6ddfbdc4a9ff0fb649e
- Child Cost Item: 5d552be0bc2fb965ac22ffef339ac25f
- Child Cost Item: bf096a590551180c1af8886c0b247db7
- Child Cost Item: 24b49c55927c456606b66d29ac827abc
- Child Cost Item: 6c95c09c4a410edca5562aa7b7db60af
- Child Cost Item: 480ca823cee214c79974a29e366a186a
- Child Cost Item: 84a0e20b7cbfbb06d44df913d17c458a
- Child Project: Contingency Basing Infrastructure
- Child Accomplishment: Toolset Development
- Child Accomplishment: Integrated Analysis and Design
- Child Accomplishment: Capabilities Implementation and Materiel Requirements
- Child Accomplishment: Program Management
- Child Cost Item: 97a58ac56990a19d27cfdac98d08edf7
- Child Cost Item: 7fae45d5a5652dc9cb93bef95261dd70
- Child Cost Item: eadde5626e21234096efb2ae92192b5f
- Child Cost Item: 1aac586e03228174b2cd6e39065ad002
- Child Project: Maneuver Support Vessel -Light (MSV-L)
- Child Accomplishment: Engineering and Manufacturing Development (EMD) Contract
- Child Accomplishment: Government Test and Evaluation Support
- Child Accomplishment: Government Furnished Equipment (GFE)
- Child Accomplishment: Program Management / Systems Engineering
- Child Accomplishment: Program Management Support Contract
- Child Accomplishment: Naval Architecture Support
- Child Accomplishment: 2019 SIBR/STTR Transfer
- Child Cost Item: f98595b76ea108aff8b3f275e6a216ec
- Child Cost Item: b0a347d816e1720778aea52faa1221f8
- Child Cost Item: 920f197c0cf981c703c822e83fa5655f
- Child Cost Item: 3b1d3afa4c290ce7c6755712ada03f4d
- Child Cost Item: cedbd71d51f03812cae6fc1fbd2d82ea
- Child Cost Item: 81a2c671dc2cbbee9efad0da18f8db8e
- Child Cost Item: ebfa50af0daf6253a9229f0b101d6c4f
- Child Project: Ultra-Lightweight Camouflage Net System (ULCANS)
- Child Accomplishment: Ultra-lightweight Camouflage Net System (ULCANS)
- Child Accomplishment: SBIR/STTR
- Child Cost Item: 607e9e59ecffddf99464d68b377a7d10
- Child Cost Item: e48dd353e786a2efbbe14a32fa292fb5
- Child Cost Item: 1ea188d5520acfc9b82efe8db27970a9
- Child Cost Item: 6a931a2a3469d295e41d35e3ac80d777
- Child Cost Item: 11da5e8df869e7390482fa3e27c85ecd
- Child Cost Item: fa6940cf89c433e5a220663a5ca3e98a
- Child Cost Item: 5e3cbb05d51a8967276a216703700d84
- Child Cost Item: 08bc6840c81efdffdc80870f282934e8
- Child Project: Combat Engineer Eq Ed
- Child Accomplishment: Mine Clearing Armor Protection (MCAP)
- Child Accomplishment: Weight Reduction in Transparent Armor (TA)
- Child Accomplishment: CEVT
- Child Accomplishment: Telematics
- Child Accomplishment: FY 2019 SBIR / STTR Transfer
- Child Cost Item: 1920354eb2c3c7b2adbcaa0e77626641
- Child Cost Item: fb7a165328f0c4893f69613df010d3ab
- Child Cost Item: 627087ae3e8d969f8100babfbaea987a
- Child Cost Item: 56fc82cab1f1a0adeee339dbfb404b53
- Child Cost Item: 8877a2900fd79d63232cafb146406a5b
- Child Cost Item: dcc1f0aa42f1292b61ef6377add964d5
- Child Cost Item: daa7c904ef873afc368d317eadc1315c
- Child Cost Item: b76f388bc969e8b175eeb83a6bc037ba
- Child Cost Item: 067264ff08c520618158266071b76e16
- Child Cost Item: aec362669269197b1ecd1c9a99bb6fd1
- Child Cost Item: a71e9ccc7bca94d8b43072e01fbf3594
- Child Cost Item: cc2161e1881a3995a22ed4d4058b4b61
- Child Cost Item: a0b1df2d26a7b5a1781d473935a49d4c
- Child Cost Item: 875a69547f5503a05be9e846430a9e5d
- Child Cost Item: 0a4ea94e0e59d513f90b5dfa31782333
- Child Cost Item: 010b432447be43ed283046c61dda7e1c
- Child Cost Item: af9a5d98ce6f7dd897dd184970328d65
- Child Cost Item: 95eec546111677f3e73dbe2efbfc5a0d
- Child Project: Tactical Bridging - Engineering Development
- Child Accomplishment: Line of Communication Bridge (LOCB)
- Child Accomplishment: Bridge Supplemental Set (BSS)
- Child Accomplishment: Family of Higher Military Load Capacity Bridges
- Child Accomplishment: FY 2019 SBIR / STTR Transfer
- Child Cost Item: aba46dffadd834c809d269f7bfd8148e
- Child Cost Item: b4d31c22ecffa35f8d47a5a56e5f2fec
- Child Cost Item: 35dfbf03d3116781db6e38c580994392
- Child Cost Item: c119eacfe3ebdb6f2f95c9d495d06ec9
- Child Cost Item: f5c1f995904ac00721e5556b089af062
- Child Cost Item: 14fec6a6607de82fccd167e35a2e6458
- Child Cost Item: a921e1a9041608ceade714e5c704ddd0
- Child Cost Item: 25b7565e7e03c600273ad9a7707b7daf
- Child Cost Item: 9ce4bfa28f14113d59cccefcf55e017a
- Child Cost Item: 1723a2890c0001527732352194e5d792
- Child Cost Item: 6e4bce5e99cc6d996b5d698b4bcd3db1
- Child Cost Item: 9e814181e9b2971b5b508d5ed11e4d17
- Child Cost Item: 67591b069cc634c029fb5a5c7dc32743
- Child Cost Item: c205d2e0fd9d7f86a681420cf9e832d4
- Child Cost Item: cf804c6c1ab1661c35db2a8a9d1bf978
- Child Cost Item: 668644cf3f8d1f9d6004e2f6b09a244c
- Child Cost Item: 633de3a36abccd4ec630faa82c4b42d1
- Child Cost Item: ed48cc1447519949443b50f97bf05fd7
- Child Cost Item: e0a9444d2dc30ea7514f0cbac5ad0df7
- Child Cost Item: 2deaaafd65afa0266a30f74559278489
- Child Cost Item: 617dffd2aaf1c345399e7e4d21b8387e
- Child Cost Item: 9bab1769e9e7c6c6fb606a8052ac090b
- Child Cost Item: 5cf0e0b4f339ce5416a1223bc9b0d89d
- Child Cost Item: aa21065b92b42b4ef4bd1a0007ed1689
- Child Cost Item: 752e4148bc4b3e6b014eeda25f4f7ce0
- Child Cost Item: cfa674ba989c98b753628fcf11eb4272
- Child Project: Materials Handling Equipment - Ed
- Child Accomplishment: System Engineering/Program Management
- Child Cost Item: 8a3af1d2877bd16afe501f1547f9b2c2
- Child Cost Item: 23ea9ebfd9267c50dc1a8973304a8fcd
- Child Cost Item: 5dde9f9e8ec20ba12a78505d48938d43
- Child Cost Item: d258cb5c6b70823428c191fafaec0239
- Child Cost Item: 87807cae01226d78ae05c12ae104766d
- Child Cost Item: 6636a02fa7961ccb0112dec8cc72c5d8
- Child Cost Item: c07655934e27737006f353bb3501f8ae
- Child Cost Item: c4afee13d0d832879ca350a17f63e886
- Child Cost Item: d046f0b41c296828e3314e25b78cda51
- Child Cost Item: d4dd09dd88615a3468ff4a5f967bd74c
- Child Cost Item: 7d7d7f0da9e9dbc1e21d9f9df5a32729
- Child Cost Item: 3b82c588590cf3ee35fe8ca4e96c774c
- Child Cost Item: 134e97adcfaa09e8ea952155390f31b0
- Child Cost Item: ee275b3991ebd6f5fe0f2225d9077466
- Child Project: Field Sustainment Support Ed
- Child Accomplishment: Advanced Low Velocity Airdrop System (ALVADS) - Light and Heavy
- Child Accomplishment: Extracted High and Low High Speed Container Delivery System (EHLSCDS)
- Child Accomplishment: Joint Precision Airdrop System-2K Block 1 upgrade (JPADS-BLK1)
- Child Accomplishment: Rapid Rigging and DeRigging Airdrop System (RRDAS)
- Child Accomplishment: SBIR/STTR
- Child Cost Item: 3cf594f9b926b58911cd97bda0f07cb8
- Child Cost Item: 0403ec9e604827332fa45a42960185ba
- Child Cost Item: ecbb139a782f44f7adf55cf23e8838ed
- Child Cost Item: 547b2cf957eb0ef10312f852845ab008
- Child Cost Item: 520e84eb2654391546fded09590294f6
- Child Cost Item: 2ee3ef75f2bb153b2ef7384fe3269ae6
- Child Cost Item: 435ae0be67bd1124c3099a1c9e8e06d4
- Child Cost Item: 7fbf76a65a5986480e3517e66398c0fa
- Child Cost Item: 905a175f74642f283a458996f096f83c
- Child Cost Item: cee701b4d2832afc901cbcdb3bdf89da
- Child Cost Item: 632c8cee32d59badf7c150fd80635482
- Child Cost Item: d0d342600d73956c926577bbee5a9b05
- Child Cost Item: d246a5ae257a25891b3001c211249987
- Child Project: Water And Petroleum Distribution - Ed
- Child Accomplishment: 3K Tactical Water Purification System (TWPS).
- Child Accomplishment: Modular Tactical Retail Refueling System (MTRRS)
- Child Accomplishment: Water Bison
- Child Accomplishment: Early Entry Fluid Distribution System (E2FDS).
- Child Accomplishment: Petroleum Expeditionary Analysis Kit (PEAK)
- Child Accomplishment: Bulk Fuel Distribution System (BFDS)
- Child Accomplishment: Petroleum Water Trace Tool (PAWTL)
- Child Accomplishment: Tactical Fuel Distribution System (TFDS)
- Child Accomplishment: PM Support
- Child Accomplishment: Load Handling System (LHS) - Compatible Water Tankrack System (HIPPO)
- Child Cost Item: 834aefcee07912c62e188a7ec2ad97f7
- Child Cost Item: f1343e6e4d280e7965f3f1034bea2bc1
- Child Cost Item: c9777be24aab9f8a7338ec6b10c2226b
- Child Cost Item: 1bba5f413f03b0f89a17b82962e9c8f8
- Child Cost Item: 86036a5682702f40606090663361daea
- Child Cost Item: facec890fd9fd4efe2723e8a9bd5cbef
- Child Cost Item: f1450eaf78551385cf97862fe61fb761
- Child Cost Item: a84008974c40b3eb690b75034c83188a
- Child Cost Item: 9dad0ee19f3da1e85cdb21052fa15914
- Child Cost Item: bbf4428861ab26191cfea6266c922a65
- Child Cost Item: 6e140574cc26cc60d1b9d3c7e9dadd92
- Child Cost Item: a4269120cbdbc09668965c9895e2a672
- Child Cost Item: 36fa47afb1939e7c483a4a6cde79d06f
- Child Cost Item: baa9f6b6683e6c17c3a006b6e7808ec0
- Child Cost Item: 0a8fd12836c788841cd469a05a1c5631
- Child Cost Item: b78d56db6f71bc0f25bff100c50bf41b
- Child Cost Item: 8f8cc9db436d4fdb0ad3e76c1c239189
- Child Cost Item: 9216b1b5fa6a0cef0ab37223795ab3bc
- Child Project: ENGINEER SUPPORT EQUIPMENT - ED
- Child Accomplishment: Family of Power Utility Kits (FoPUK)
- Child Accomplishment: Supervisory Propulsion, Emergency and Recovery Set (SPEaRS)
- Child Accomplishment: Engineering and Quality Assurance
- Child Accomplishment: Airfield Damage Repair Kit (ADRK)
- Child Accomplishment: Program Managment Support
- Child Accomplishment: Special Tools
- Child Accomplishment: Photo Support Set
- Child Accomplishment: Diver Supplemental Issue Set
- Child Accomplishment: Soldier Portable System
- Child Cost Item: 4462bb64db7ab4893b5cfb2c811975ce
- Child Cost Item: fa4c4a8a3df327e3fe79d885bfd0d985
- Child Cost Item: 538f266e1146bd4f563221261a01d854
- Child Cost Item: 23ab976ce66fa586b4bd9a606be79038
- Child Cost Item: 4d600782723297ec979b5a2ec3bb6349
- Child Cost Item: 674d958a3920673e333b17bb38c4896f
- Child Cost Item: 3200f62b9eb11dc3d3d84a56b383bc15
- Child Cost Item: 196ac889cc5298affea0e4d4ebd39d14
- Child Cost Item: 7ff34ce09bd5c2952bfe8d64f63fbc0a
- Child Cost Item: b53d88ed423f85b0528b99d168678139
- Child Cost Item: 2837fc72a8682fdb6015388866c2f6a9
- Child Cost Item: 47a8704dcd5b6a340a3d1654eb72064a
- Child Cost Item: a12dc044946af60ecfa90f464f0b08b7
- Child Cost Item: e7d8a3716a1732f03f4119c55c0676c2
- Child Cost Item: 99ccf01e8a0d51643eda71ea9788075c
- Child Cost Item: 66603a6c4d1f4fb8bf7bcfe567ccccea
- Child Cost Item: 811dfa9f6179f7b38eafaae3d8d3b731
- Child Cost Item: 22a8de1bfc1cfb0e6f7788a334f39920
- Child Cost Item: 34f5e83e036b60f593af2c3d35bc429a
- Child Cost Item: 92da463c4f436533da077928cc8b9290
- Child Cost Item: 7c7fd0ea8bb7359620999ba3f66d9764
- Child Cost Item: 20bd5964d80c322fd24b31c5a27ce34f
- Child Cost Item: b3d21527065add8d87e884634e3049c4
- Child Cost Item: 30c97fc4953d5d855cc3098c0aec67de
- Child Project: Maintenance Support Equipment
- Child Accomplishment: Next Generation Shop Equipment, Welding (SEW)
- Child Accomplishment: Armament Repair Shop Set (ARSS) 2
- Child Accomplishment: Special Tools
- Child Accomplishment: Refrigeration Tool Kit (RTK)
- Child Accomplishment: MWMSS Additive Manufacturing
- Child Accomplishment: The Fire Suppression Refill System (FSRS)
- Child Accomplishment: Next Generation Shop Equipment Contact Maintenance (SECM)
- Child Accomplishment: Program Management Support
- Child Accomplishment: Packaging Support
- Child Accomplishment: Engineering and Quality Assurance Support
- Child Accomplishment: FY 2019 SBIR / STTR Transfer
- Child Cost Item: de4c70228bdbe01b8af6c7db9cb1675b
- Child Cost Item: 5140936feadeb6d2a8f7988a71a5cdec
- Child Cost Item: 8eb09cdec74641c8dbf10d627fb91bc2
- Child Cost Item: 393e73f65849c1d8eeb04e5a7863622e
- Child Cost Item: 24f49bf25ca093b29176a091bfeceb43
- Child Cost Item: d7d14990a062c075fe234498f6111c9a
- Child Cost Item: 692671abed027fc11a47c6f8c3af0d60
- Child Cost Item: 175f38963ef77f67db3888eed2366b98
- Child Cost Item: c52e50dd4c48b8654a7836964e6159fe
- Child Cost Item: f3be6437781f9a9e4eba21822b357177
- Child Cost Item: df097f940e51588f09d0f964d596366c
- Child Cost Item: f19a2f89ba7db915ca0665977aa59966
- Child Cost Item: f87415749966321728d94f6686ec48ca
- Child Cost Item: 1b6cdad7891bd20157998096edb7e2b9
- Child Cost Item: 581bc999fc2df76a4daf75a05b8e2b48
- Child Cost Item: d531bfd46bbd57eccae033e05a913f81
- Child Cost Item: 2cb7d383107ff60ce01c4fa5d14dc907
- Child Cost Item: 270ef5b866e02fb1a4fd03e85cfc1fd2
- Child Cost Item: 8df168295621fbad49d92a30712c10cf
- Child Cost Item: ad982bc8de2f23a309db3d92a8e34ad8
- Child Cost Item: c841bc7f0526ac0453ca897f6965c399
- Child Project: Improved Environmental Control Units Ed
- Child Accomplishment: Technology Development
- Child Accomplishment: Government System Test and Evaluation
- Child Accomplishment: Other Contract and Government Agency
- Child Accomplishment: Government Program Management
- Child Accomplishment: SBIR/STTR
- Child Cost Item: b7b28b5cb66bc66b7675ac5420bf44b5
- Child Cost Item: ed4c6aa62350a218bffa6d7d00b786f3
- Child Cost Item: ca0772955006b00b5b596b304a0fd8ed
- Child Cost Item: a68f0def4fed619b4901a9c529573498
- Child Cost Item: d841b714cbaad872152c5819667ac630
- Child Cost Item: d1973620ad6a2ef0829ab8a573839262
- Child Cost Item: 8bbba078aa3a2ffe015e2f1134e64094
- Child Cost Item: 4b5dbe81d6d7abb97e75eef48f7b3dee
- Child Cost Item: 0c707edb523eb959cd75db0ede3468ec
- Child Cost Item: 9c8e88847055ee3ec78e7b537e744745
- Child Cost Item: e5929f85f8a1bcf49eefcb77853b5dd5
- Child Cost Item: 063f5789fd7c5342025c900276795189
- Child Cost Item: f13d94669f53ec8586005fb4209b4863
- Child Cost Item: 31fdf00c9463363914084b2546d3112c
- Child Cost Item: e8c3ec6223c133ec265411b03c082e13
- Child Cost Item: fc8875180a2354ecab94c2b925bedd78
- Child Cost Item: a8e989c14e12ead1963b6719a66dc541
- Child Project: Combat Service Support Systems
- Child Accomplishment: Expeditionary Shelter Protection System (ESPS)
- Child Accomplishment: Family of Space Heaters
- Child Accomplishment: Resource and Energy Efficiency Enabling Solutions
- Child Accomplishment: Laundry and Shower Improvements
- Child Accomplishment: Expeditionary Solid Waste Disposal (ESWDS)
- Child Accomplishment: Containerized Ice Making System (CIMS)
- Child Accomplishment: Army Standard Family of Rigid Wall Shelters (ASF-RWS)
- Child Accomplishment: SBIR/STTR
- Child Cost Item: be5fe720853c1cb757eaf5ac233c4a83
- Child Cost Item: bc032b12d963644231331eedc2c20fe5
- Child Cost Item: b7756acb1a7aafae5eb6fdadea42ab59
- Child Cost Item: 536f6ab56adc8903c509c742aafbf923
- Child Cost Item: c1dfdfa45f5a5d472a913cfe71d0eb4e
- Child Cost Item: 83f76a210abb0ac6d9480eb49ed2002c
- Child Cost Item: 92bfdb59bbea3ec27bc25d3465e083c9
- Child Cost Item: a04b05bcce564baf79124318db993922
- Child Cost Item: 1b609cce1da050ff4a1a85f2c3883ff9
- Child Cost Item: 63648db78a10b69f660d7c87c62e3170
- Child Cost Item: 7cbe6eb827c8cbc3ec54f648a0cc7bd7