Transporter Erector Replacement Program (TERP)

Abstract

Design and develop the capabilities necessary to replace the current TE. Update drawings, specifications and TOs to eliminate parts obsolescence and address intended usage through 2030. Qualify system prior to production.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2013
Source ID
c3d7668d54c3751b62b4992517dca274

Tags

Readers

  • Instructional Design and Training Evaluation.
  • Logistics and Supply Chain Management.
  • Naval Mine Countermeasure Systems Development.

Related Documents