ICBM - EMD

Abstract

Intercontinental Ballistic Missile (ICBM) Engineering and Manufacturing Development (EMD) efforts will ensure the extension of the operational life of the Minuteman III ICBM weapon system through 2030. The Support Equipment program designs, develops, and tests replacement of obsolete/non-serviceable weapon system support equipment. The efforts include design, development, and testing of replacement Electrical-Electronic Equipment Test Sets, Reentry Field Support Equipment, Minuteman Code System Media, the Payload Transporter Tractor and Trailer, Higher Authority Command/Rapid Message Processing Element (HAC/RMPE) Message Generator, the Targeting Application Computer for Single Integrated Operation Plan (SIOP) Targeting Application Computer System (STACS) and Transporter Erectors (TE). The ICBM Cryptography Upgrade Increment II program expands on the ICBM Cryptography Upgrade Increment I program to incorporate remote key/code change and irreversible transformation of launch/enable codes increasing nuclear weapons security during annual code change cycles. ICBM EMD: Fuze Support reflects FY2012 effort related to fuze modernization efforts previously included in PE 0604222F and now included in PE 0604933. The Operational Equipment program designs, develops, and tests replacement of weapon system equipment. The efforts include: (1)design, development, and testing of modifications to the Weapon System Processor (WSP) circuit card to prevent status monitoring loss and modifications to WSP circuit card seating hardware; (2)solid rocket motor modernization efforts to define operational requirements and acquisition strategy for a solid rocket motor follow-on program. This program is in Budget Activity 5, System Development and Demonstration (SDD) because it has passed Milestone B approval and is conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full-rate production.

Open PDF

Document Details

Document Type
R2 Budgetary Justification
Publication Date
Oct 01, 2013
Source ID
0604851F_5_3600_PB_2013
Change Summary Explanation
FY2011 adjustments reflect a $3M reprogramming and $2.057 for SBIR. FY2012 Congressional Directed Reductions reflect contract delays in Project Number 655037, Support Equipment. For FY2013, funding reflects an $18.321M increase to project number 655037 for the Transporter Erector (TE) Replacement new start program, an $8.0M increase for the Solid Rocket Motor Modernization Program new start, a $73.512M transfer of ICBM Fuze Modernization to PE 0604933, and a $17.130M decrease for higher Air Force priorities.
Service Agency Name
Air Force

Entities

Organizations

  • United States Air Force

Tags

Communities of Interest

  • Counter WMD
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Ballistic Missiles
  • Contracts
  • Electronic Equipment
  • Engineering
  • Fabrication
  • Failure Mode And Effect Analysis
  • Intercontinental Ballistic Missiles
  • Message Processing
  • National Security
  • Nuclear Weapons
  • Rocket Engines
  • Rockets
  • Test And Evaluation
  • Test Sets
  • Transporter Erectors
  • Weapon Systems

Readers

  • Missile Defense Systems.
  • Naval Mine Countermeasure Systems Development.
  • Software Engineering

Technology Areas

  • Cyber
  • Microelectronics
  • Microelectronics - Microelectromechanical Systems

Related Documents